BPMNG012
| Rule Text | Spec Refs |
|---|---|
If a Conditional Sequence Flow is used out of an Activity, then there must be at least one other outgoing Sequence Flow from that Activity. |
| Rule Text | Spec Refs |
|---|---|
If a Conditional Sequence Flow is used out of an Activity, then there must be at least one other outgoing Sequence Flow from that Activity. |