Collaborations
Spec Page | Spec Rule Text |
---|---|
112 |
A Pool is a square-cornered rectangle that MUST be drawn with a solid single line. |
112 |
The label for the Pool MAY be placed in any location and direction within the Pool, but MUST be separated from the contents of the Pool by a single line. |
112 |
If the Pool is a black box (i.e., does not contain a Process), then the label for the Pool MAY be placed anywhere within the Pool without a single line separator. |
114 |
The marker for a Pool that is a multi-instance MUST be a set of three vertical lines in parallel. |
114 |
The marker (multi-instance for a Pool), if used, MUST be centered at the bottom of the shape. |
121 |
A Message Flow is a line with an open circle line start and an open arrowhead line end that MUST be drawn with a dashed single line. |
121 |
The use of text, color, size, and lines for a Message Flow MUST follow the rules defined in Section “Use of Text, Color, Size, and Lines in a Diagram” on page 41. |